REPAIR PART 3 OF 3 - Press in rubber seal
WARNING: This page is about a different variant/trim than selected.
- Press down gasket using contact pressure (forced pressure not necessary) for > 1 minute.
IMPORTANT:
Load can be applied to the bonding only after a period of 2 minutes. This waiting time is absolutely essential.