51 13 305 Removing and installing/replacing left or right roof railing
WARNING: This page is about a different variant/trim than selected.
Necessary preliminary tasks:
- Lower HEADLINING
Removal:
Unscrew nuts (1).
Remove roof rails (1).
Installation:
Gasket on roof rails (2) must not be damaged.
Replace butyl rope around the threaded bolt (1s) (use butyl rope 4 mm diameter).
Put compensating element (1) on the roof outer skin by twisting the hexagon head (2).
Tightening torque 51 13 9AZ .
Mount the roof rails.
Replace nuts (1).
Tighten down nuts (1).
Tightening torque 51 13 5AZ .