Notes for work on the cooling system (Cooper)
Only carry out repair on the cooling system after the engine has cooled down!
Never reuse used coolant!
When replacing and removing components which rely on the corrosion protection effect of the coolant, it is essential to change the coolant. The cooling system must therefore be drained and refilled.
In the case of other removal work involving the draining of part quantities of coolant, replace these quantities which have been drained with new coolant.
Opening the cooling system while hot can result in air entering the system.
This can cause overheating with permanent damage to the engine.
Cover alternator with suitable materials.
Failure to comply with this procedure may result in an alternator malfunction.
Recycling:
Catch and dispose of drained coolant.
Observe country-specific waste disposal regulations.
Set of special tools 17 2 050 for removing and installing the spring holder clamps for coolant hoses.
- (1) Release tool
- (2) Pliers (bent version)
- (3) Pliers (straight version)
Loosen spring strap (1) with the pliers (2).
Unlock spring strap (1) with the release tool (2).
| HAZET number: | Description |
|---|---|
| 4590-1 | Length of disconnect pliers (mm): 150 |
| 4590-2 | Length of disconnect pliers (mm): 180 |
| 4590-3 | Length of disconnect pliers (mm): 253 |
| 4590/2 | Set of clamping pliers |
| 4590/3 | Set of clamping pliers |
Notes for disassembly/assembly of coolant hose quick-release couplings
Dismantling of quick-release coupling
Pull out lock (1) and (2). Detach hose.
Installation note:
Check O-rings (1).
Do not coat O-rings (1) with lubricant.
Assembly of quick-release coupling
Press in lock (1) before installing quick-release coupling.
Push on hose.
Quick-release couplings must clearly snap audibly into place.