REP-TAT-P-5175-02 Installing undershield on right
NOTE:
Description is for left component only. Procedure on the right side is identical.
- Position the undershield (1) correctly.
- Tighten all bolts and nuts (arrows).
TIGHTENING TORQUE SPECIFICATION
| Undershield, side | |
|---|---|
| Plastic nut | |
| Tightening torque | |
| 2.6 Nm | |
TIGHTENING TORQUE SPECIFICATION
| Undershield, side | |
|---|---|
| Hexagon screw | |
| Tightening torque | |
| 2.6 Nm | |
- replace screws (1). Parts: screw
- Tighten the screws (1).
TIGHTENING TORQUE SPECIFICATION
| Torsion strut to mounting | |
|---|---|
| Hexagon screw M12x48 Replace screws | |
| Joining torque | |
| 100 Nm | |
| Angle of rotation | |
| 90° | |
| Torx screw M10x16 | |
| Tightening torque | |
| 38 Nm | |
Install RIGHT TENSION STRUT
Install TRAILING LINK
- Position tension strut (3).
- Tighten the screws (1).
TIGHTENING TORQUE SPECIFICATION
| Torsion strut to front axle/body, middle | |
|---|---|
| M10 | |
| Joining torque | |
| 56 Nm | |
| Angle of rotation | |
| 90° | |
- Tighten down screw (2).
TIGHTENING TORQUE SPECIFICATION
| Torsion strut to side member | |
|---|---|
| M12 | |
| Joining torque | |
| 100 Nm | |
| Angle of rotation | |
| 70° | |