LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2014 >> Cooper S, 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 2186 (COLLISION - BODY PANEL REPAIR (E61) 535xi) >> Support Members >> 41 13... Left Bulkhead Partial Replacement (Engine Carrier Front Section Removed)

41 13... Left Bulkhead Partial Replacement (Engine Carrier Front Section Removed)

WARNING: This page is about a different car, the 2010 BMW 535xi, 2009 BMW 535xi, and 2008 BMW 535xi. However, it is still accessible from the selected car via links, so may be relevant.

Read contents of BODY, GENERAL .

The reduced-weight aluminum front end structure (GRAV) is used on this vehicle.

Observe relevant procedures in BODY, GENERAL .

Following new body parts are required:

  1. Bulkhead
G05503255Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in areas (1) and (2).

Installation: 

Use 8 rivets (size 13) in area (1).

Use 3 rivets (size 13) in areas (2).

G05503325Courtesy of BMW OF NORTH AMERICA, INC.

Mark severance cut (1) in accordance with measurements a and b.

Measurement a = 30 mm

Measurement b = 10 mm

Fig 1: Severance Cut Mark In Accordance With Measurements A And B
G05503257Courtesy of BMW OF NORTH AMERICA, INC.

Mark severance cut (1) in accordance with measurements a and b and cut bulkhead.

Measurement a = 305 mm

Measurement b = 365 mm

NOTE: Severance cut (1) runs next to contact surface (2) for engine carrier front section.
Cut area (2) from engine compartment side.
Fig 2: Severance Cut Mark In Accordance With Measurements A And B And Cut Bulkhead
G05503258Courtesy of BMW OF NORTH AMERICA, INC.

Preparation of new part: 

Mark new part in accordance with severance cut on vehicle + 20 mm extra material and cut (1).

Fig 3: New Part Mark In Accordance With Severance Cut On Vehicle + 20 mm Extra Material And Cut
G05503259Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Position new component from inside.

In area (1) new component is situated between bulkhead and reinforcement (2).

Check attachment parts for ease of movement.

Fig 4: Area New Component Is Situated Between Bulkhead And Reinforcement
G05503260Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 11 rivets (size 13) in area (1).

Use 1 rivet (size 13) in area (2).

Use 3 rivets (size 15) in area (3).

Area (4) is only riveted together with engine carrier.

Use 4 rivets (size 15) in area (4).

Area (5) is only riveted together with outer bulkhead support carrier.

Drill holes for rivets.

Glue and rivet new component together with engine carrier front section and outer bulkhead support carrier.

Pay attention to potlife of adhesive.

Fig 5: Rivets Area
G05503261Courtesy of BMW OF NORTH AMERICA, INC.