LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2014 >> Cooper Base, 2D Convertible, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 3036 (COLLISION - BODY PANEL REPAIR (E90) 328i, 328xi, 335i, 335xi) >> 4111 Support Members >> 4111023 Replacing Front Section Of Engine Support To Left Wheel Arch >> Installing Wheel Arch

Installing Wheel Arch

WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2011 BMW 328xi, 2011 BMW 328i, 2010 BMW 335xi, 2010 BMW 335i, and 2010 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: Do not grind/sand new parts in area of bonding surfaces.

Clean bonding surfaces with adhesive cleaning agent R1.

Apply adhesive K1 to bonding surfaces.

Install new parts and rivet with blind rivets.

IMPORTANT: Three-plate connection (1)!
In area (1) rivet new part on both sides offset with 4 punch rivets N5.

Use 14 punch rivets N5 in area (2).

Use 18 punch rivets N5 in area (3).

Fig 1: Identifying Rivet Areas On Wheel Arch
G06854775Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Vehicles with spring strut dome plate insert: 

Different plate inserts are fitted, depending on the model.

IMPORTANT: Use only identical plate inserts on both sides of the vehicle.

Riveted version:

If damaged, the plate inserts must always be replaced with screwed versions on both sides of the vehicle.

Fig 2: Identifying Spring Strut Dome Plate Insert
G04726804Courtesy of BMW OF NORTH AMERICA, INC.

Glued version:

Adhesive/contact surfaces of plate insert must be free of sealing compound, final paint coat and underseal.

Do not grind off primer.

Use adhesive gun 41 3 102 in conjunction with adhesive K3.

Apply K3 adhesive in areas (1). Do not apply any adhesive in area (2).

Secure plate insert with 3 screws and nuts for 2 hours at min. 20°C.

Fig 3: Identifying K3 Adhesive Applying Areas
G05778771Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Operational strength is only achieved after 12 hours!