41 13... Left Bulkhead Partial Replacement (Engine Carrier Front Section Removed)
The reduced-weight aluminum front end structure (GRAV) is used on this vehicle.
Observe specific procedure .
Following new body parts are required:
- Bulkhead
Open rivet joints in areas (1) and (2).
Installation:
Use 8 rivets (size 13) in area (1).
Use 3 rivets (size 13) in areas (2).
Mark severance cut (1) in accordance with measurements a and b.
Measurement a=30 mm
Measurement b=10 mm
Mark severance cut (1) in accordance with measurements a and b and cut bulkhead.
Measurement a=305 mm
Measurement b=365 mm
Cut area (2) from engine compartment side.
Preparation of new part:
Mark new part in accordance with severance cut on vehicle + 20 mm extra material and cut (1).
Installation:
Position new component from inside.
In area (1) new component is situated between bulkhead and reinforcement (2).
Check attachment parts for ease of movement.
Installation:
Use 11 rivets (size 13) in area (1).
Use 1 rivet (size 13) in area (2).
Use 3 rivets (size 15) in area (3).
Area (4) is only riveted together with engine carrier.
Use 4 rivets (size 15) in area (4).
Area (5) is only riveted together with outer bulkhead support carrier.
Drill holes for rivets .
Glue and rivet new component together with engine carrier front section and outer bulkhead support carrier.
Pay attention to potlife of adhesive.