LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2013 >> Cooper JCW, 2D Convertible, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 1921 (COLLISION - BODY PANEL REPAIR (E60) 528i, 528xi) >> Support Members >> 41 11 516 Replacing Left Support Carrier

41 11 516 Replacing Left Support Carrier

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2010 BMW 528xi, 2010 BMW 528i, 2009 BMW 528xi, 2009 BMW 528i, and 2008 BMW 528xi. However, it is still accessible from the selected car via links, so may be relevant.

The reduced-weight aluminium front end structure (GRAV) is used on this vehicle.

Observe specific procedure.

Place vehicle on straightening bench.

NOTE: Damaged support carriers without cracks, sharp-edged damage or holes can be straightened. After repair work, check support carrier again for cracks.
Observe 41 00... FRAME ALIGNMENT CONTROL BODY DIMENSIONS !

Following new body parts are required :

Open riveted joints in areas (1).

Open EMC weld seam in area (1).

Installation: 

Carry over hole pattern from engine carrier to engine mounting in area (1).

Fig 2: Open Riveted Joints Areas
G05477169Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 2 EMC screws in areas (1).

Use 2 EMC screws in areas (3).

If an engine carrier partial replacement has been carried out, 2 EMC screws must be used in areas (2).

Fig 3: Riveted Joints Areas
G05477170Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: View from above

Mark severance cut in accordance with measurements a and b and cut support carrier at top.

Measurement a =77 mm from recess

Measurement b =215 mm from centre of bore

Fig 4: Recess And Centre Of Bore Measurement
G05477171Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: View from below

Mark severance cut in accordance with measurement a and cut support carrier at bottom.

Measurement a =57 mm parallel to edge of spring support at front

Fig 5: Parallel To Edge Of Spring Support Front Measurement
G05477172Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Carry over bores from engine carrier to new part in areas (1).

Adapt new part with straightening attachment or universal mount in area (2).

Drill through new part and engine carrier together.

Use 4 rivets (size 13) in areas (1).

IMPORTANT: If a partial replacement has already been carried out on the engine carrier, rivets (size 15) must be used in areas (1).
Fig 6: Attachment Or Universal Mount Area
G05477173Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Drill out rivets with 4 mm dia.

Drill holes for 6 rivets in area (1).

Drill holes for 5 rivets in area (2).

Drill through all holes through both parts together.

Coat all contact faces with adhesive.

Join parts and rivet.

Fig 7: Drill Out Rivets
G05477174Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 2 EMC screws after bonding new parts in areas (1).

Fig 8: Bonding Parts Areas
G05477175Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Left side only:

Rivet down blind rivet nut 41 32 8 257 508 in bore (1).

Fig 9: Rivet Nut LH
G05477176Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Right side only:

Rivet down blind rivet nut 41 12 8 223 082 in bore (1).

Fig 10: Rivet Nut RH
G05477177Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Seal cutting line and rivets with sprayable body sealing compound .

Spray gun required for body sealing compound .

Different riveting-down elements, depending on the equipment specification, must be mounted on the new component.

Required tools are featured on the Workshop Equipment Planning CD (WEP).