13 53 170 Removing and installing/replacing all pressure lines (N63)
Special tools required:
Disconnect NEGATIVE BATTERY TERMINAL (risk of fire due to short-circuiting on dismantling).
Observe warning on cylinder head cover.
Wear full face guard and protective gloves.
Fuel can emerge spontaneously at high speed when the high pressure line is released!
Introduced dirt contamination can cause malfunctions in the system!
- Do not allow any dirt particles or foreign bodies to get into the system.
- Remove all traces of dirt before removing lines or separate components.
- Use only fluff-free cloths.
- Seal all fuel system openings with protective caps or plugs 32 1 270 .
- High pressure lines may be rescrewed a maximum of 10 times.
Recycling:
Fuel escapes when fuel lines are detached.
Catch and dispose of escaping fuel in a suitable collecting vessel.
Observe country-specific waste disposal regulations.
- Ignition coils must not be fouled by fuel!
The durability of the silicone material is greatly reduced by contact with fuel, which can lead to failure of the ignition coil. It is therefore essential to protect the spark plug slot against ingress of fuel with a cloth!
- Before installing ignition coils, clean spark plug slots with compressed air.
- Make sure the spark plug slot is absolutely clean.
Necessary preliminary tasks:
- Remove IGNITION COILS
- Drain off AIR CONDITIONING SYSTEM
- Remove INTAKE PORT on left and right
- Remove REAR RIGHT SUSPENSION CROSS-BRACE
- Remove REAR UNDERBODY PROTECTION
- Release COOLANT EXPANSION TANK and place to one side
- Remove WATER VALVE for heater/air conditioner and lay coolant hoses to one side.
In all-wheel-drive vehicles:
- Remove STIFFENING PLATE
Unlock and detach plug connections (1 and 2).
Release transmission wiring harness (3) from marked clamps.
Unfasten plug connection (1) and disconnect.
Slide transmission wiring harness as far as possible in the upward direction.
Pull gasket (1) in the operating range off in an upward direction.
Unfasten screws (2).
Release screws (3).
Tightening torque 51 71 3AZ .
Remove right bulkhead side section (4) upwards.
Release screws (1).
Tightening torque 12 90 4AZ .
Release clamp (2).
Remove lid (3) from auxiliary box.
Unclip grommet hold-down device (1).
Release wiring harness (2) from bulkhead.
Unlock connector (3) and remove.
Release screws (1).
Tightening torque 12 90 2AZ .
Remove electronics box cover (2).
Unlock all connectors (1) from control unit and disconnect.
Unclip grommet hold-down device (2) and remove.
Detach rubber grommets (3) from electronics box. Place wiring harnesses to the side.
Installation note:
Make sure grommets are correctly seated (watertightness).
Slacken nut (1).
Tightening torque 12 51 1AZ .
Detach earthing cable (2).
Release screw (1).
Lay filler neck (2) for windscreen washer fluid to one side.
Release screws (1).
Tightening torque 12 90 1AZ .
Unclip coolant lines at clamp (2) from electronics box.
Carefully feed out the electronics box (1) complete with control unit upwards and place to one side.
Installation note:
When installing the electronics box (1), insert guide (3) on engine support.
Open cover.
Release screw (1).
Tightening torque 12 42 3AZD .
Remove positive battery cable lead (2) from positive battery connection point.
Release positive battery cable (2) from clamps (3).
Release screw (1).
Tightening torque 64 53 3AZ .
Detach A/C line (2) and place to one side.
Replace sealing ring on A/C line.
Slacken nut (1).
Tightening torque 12 42 7AZ .
Remove positive battery cable (2) and place to one side.
Release clamp (1).
Tightening torque 13 71 8AZ .
Release clamp (2).
Replace clamp (2).
Remove right charge-air duct (3).
Check the gasket on the exhaust turbocharger. replacing if necessary.
Picture shows the left side, the procedure for the right side is identical.
Detach hoses (1) from clean air pipe.
Release screw (2).
Tightening torque 13 71 1AZ .
Detach clean-air pipe (3) in direction of travel from exhaust turbocharger.
Check seal on clean air pipe and renew if necessary.
Release screw (1).
Tightening torque 12 51 2AZ .
Unlock plug connections for oxygen sensor and disconnect.
Release screws (1).
Tightening torque 12 51 2AZ .
Release wiring harness (2).
Release wiring harness (3) and place to one side.
Release screw (1).
Tightening torque 12 51 2AZ .
Raise cable duct (2).
Lay positive battery cable (1) and wiring harness for injectors (2) forwards.
Slightly raise engine wiring harness (3).
Release clamp (1).
Tightening torque 13 71 8AZ .
Pull left charge air line (3) off of exhaust turbocharger.
Installation note:
Check the gasket on the exhaust turbocharger. replacing if necessary.
Picture shows the left side, the procedure for the right side is identical.
Detach hoses (1) from clean air pipe.
Release screw (2).
Tightening torque 13 71 1AZ .
Detach clean-air pipe (3) in direction of travel from exhaust turbocharger.
Check seal on clean air pipe and renew if necessary.
Disconnect fuel delivery line. Seal fuel lines with special tools (1) 13 5 160 and (2) 13 5 162 .
Catch and dispose of escaping fuel.
Release screws (1).
Tightening torque 12 51 2AZ .
Raise cable duct (2).
Release screws (1).
Tightening torque 12 51 2AZ .
Release screw (2).
Place wiring loom (4) to one side.
Release wiring harness (3) and place to one side.
Disconnect fuel delivery line. Seal fuel lines with special tools (1) 13 5 160 and (2) 13 5 162 .
Catch and dispose of escaping fuel.
Remove pressure line from injector to rail .
First disconnect the pressure line from the rail. To reduce existing fuel pressure if necessary. Fuel must not get into the spark plug slot. Then disconnect the pressure line from the injector.
Release union nuts (1).
Disconnect pressure line (2).
Set down pressure lines in order.
Secure injector against twisting with spanner (2).
Release union nut (1).
Mark pressure lines.
Installation note:
Only if injector has to be rotated in fitted position:
- Release bolt a few turns until holding-down device (3) is slackened.
- Turn injector (1) in direction of arrow until union nuts (2) on pressure line can be easily screwed on by hand.
- To do so, engage spanner on hexagon head of injector if necessary.
- Tighten union nuts on pressure line hand-tight.
If the injector is pulled out of the bore hole, the PTFE sealing ring must be replaced! Replacing PTFE sealing ring, refer to 13 53 315 . See 13 53 721 REPLACING ONE INJECTOR, CYLINDERS 1-4 (N63) or 13 53 722 REPLACING ONE INJECTOR, CYLINDERS 5-8 (N63) .
Adhere to tightening sequence:
- First tighten down union nut on injector.
- Then tighten down union nut on rail.
Tighten pressure lines with special tool 13 0 160 .
Tighten pressure line on injector with torque wrench (2) and special tool (1) 13 0 161 . Secure the injector from turning.
Tighten union nuts with special tool (1) 13 0 161 .
Tightening torque 13 53 2AZ .
For cylinders 4 and 8, tighten pressure line (1) with torque (2) and crowfoot wrench (3). Secure the injector from turning.
Tightening torque 13 53 2AZ .
Tighten down pressure line on rail with torque wrench (1) and special tools (2) 00 1 440 , (3) 13 0 162 and (4) 13 0 161 .
Tightening torque 13 53 2AZ .
Installation note:
When tightening the pressure line on the rail, ensure that the angle of rotation of special tool 13 0 161 is restricted. Reapply the special tool if necessary.
Distortion of torque possible.
Remove high pressure line from high pressure pump to rail .
Picture shows left side. Procedure for the right side is identical.
Release union nuts (1).
Disconnect pressure line (2).
Refit high pressure line from high pressure pump to rail .
Tighten down pressure line (1) hand-tight on rail and injector.
First tighten high-pressure line (1) on high-pressure pump using torque wrench (2) and special tool (3) 00 1 440 .
Tightening torque 13 53 3AZ .
Installation note:
When tightening the pressure line on the rail, ensure that the angle of rotation of special tool 13 0 140 is restricted. Reapply the special tool if necessary.
Tighten high-pressure line (1) on rail using torque wrench (2), long crowfoot spanner (3) and special tool (4) 13 0 140 .
Tightening torque 13 53 3AZ .
Assemble engine.
Bleed fuel system with BMW diagnosis system.
Check fuel system for tightness.
Check function of DME.