41 31 001 Replacing Roof Outer Skin (Version With Slide/Tilt Sunroof)
Special Tools Required
- 41 3 010
Refer to relevant service information in BODY, GENERAL .
Observe procedures in REPAIR STAGE 2 .
The following new body parts are required:
- (1) Roof outer skin, panorama sunroof
Open welding spots in areas (1).
Open weld seams in areas (2).
Open adhesive bonds in areas (1).
Open welding spots in area (2).
Take off roof panel.
Preparation of new part:
Cut all four roof rack reinforcements (1) along lines (2).
Operation is described on the left side. Right side identical.
Adjust roof outer skin to fit and secure.
Set two Ø 4.2 mm bore holes for blind rivets in areas (1).
Remove new part again and deburr bore holes.
Installing roof outer skin:
Clean all bonding surfaces on new part and on vehicle with cleaning agent R1.
Apply adhesive in area (1) as standard and in area (2).
Apply adhesive in areas (1).
Operation is described on the left side. Right side identical.
Mount roof outer skin and rivet with N3 blind rivets (1).
In area (1) rivet roof outer skin with 7 N4 punch rivets.
In area (1) rivet roof outer skin with 8 N4 punch rivets.
In areas (1) and (2) rivet roof outer skin with N4 punch rivets.
| Area | Number |
|---|---|
| 1 | 4 |
| 2 | 2 |
After adhesive has hardened:
Use 2 EMC SCREWS in suitable areas of roof outer skin.
Lay 2 cartridges in a heat-resistant container and weight down.
Fill container with approx. 3 liters boiling water.
Insert cartridges for approx. 30 minutes.
Insert heated cartridge shortly before processing in cartridge pistol 41 3 010, remove cap and allow both components to emerge. Wipe adhesive components uniformly and attach new mixing tube.
Tip of fill level indicator (1) indicates the current position of the plunger.
For optimum mixing of components, allow structural foam to emerge up to marking (2) and discard.
Fill all 4 areas of roof rack reinforcements with foam.
- Threaded inserts
Starting at front left, fill square holes (2) with 75 ml of structural foam each.
In so doing, hold mixing tube at an angle of approx. 30°.
Immediately after applying foam, press expansion nuts into square holes.
Repeat procedure on right side of car with second cartridge.
Operational strength of car is achieved after 24 hours.