23 00 026 Removing and installing transmission (GS6-55BG)
Special tools required:
- 00 2 030
- 23 4 150
Necessary preliminary tasks:
- Disconnect BATTERY
- Drain off TRANSMISSION OIL .
- Secure engine in INSTALLATION POSITION .
- Remove TRANSMISSION SUPPORT BRACKET .
- Remove TRANSMISSION MOUNT .
- Remove FRONT AXLE SUPPORT
.
No wheel alignment is required for removal and installation of front axle support.
- Remove LEFT OUTPUT SHAFT .
- Remove RIGHT OUTPUT SHAFT .
Release clips on stop/holder (1).
Detach selector lever cable (2) from ball joint.
Release screw (3) and remove bracket.
Disconnect plug (1) for reversing light switch.
If necessary, disconnect plug connection (1) on zero gear sensor.
Remove cable (2) with holder from transmission.
Release nuts (1) and remove clutch slave cylinder.
Tightening torque 21 52 2AZ
Release bolt (1) WAF 13 from above.
Release bolts (2) and remove starter.
Tightening torque 12 41 1AZ
Supporting transmission:
With special tools 23 4 150 and 00 2 030
Support transmission from underneath.
Secure transmission with tensioning strap (3).
Tasks are described in TRANSMISSION BRACKET .
After completion of work, check TRANSMISSION OIL LEVEL .
Release screws.
Tightening torque 23 00 1AZ
Pull transmission downwards and remove.
Installation note:
Check that adapter sleeves (1/2) are correctly seated.
Replace damaged dowel sleeves.
Installation note:
Remove grease from transmission input shaft and clean shaft.
Do not grease transmission input shaft.
Check clutch disc for friction rust in gearing and REPLACE if necessary.
Installation note:
- If reusing the clutch:
Mechanically remove existing grease and lining abrasion from splines of clutch plate (with a cloth).
Clean clutch hub and regrease.
On new clutch discs the gearing is already greased.
Refer to OPERATING FLUIDS
- Remove and clean RELEASE BEARING AND RELEASE LEVER
- Add TRANSMISSION OIL .