LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 228 (Fuel System - Repair - R57 (N12)) >> Throttle And Operation >> 13 54 030 Removing and installing/sealing the throttle body (N12, N16)

13 54 030 Removing and installing/sealing the throttle body (N12, N16)

WARNING: This page is about a different variant/trim than selected.

Necessary preliminary work: 

Release screws.

Tightening torque 13 54 1AZ .

Carefully feed out throttle body (1) toward the top until the connector for the cable connection is accessible.

Unlock connector and remove.

Remove throttle body (1).

Fig 1: Locating Throttle Body Screws
G04796471Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Replace sealing ring (1).

Fig 2: Identifying Sealing Ring
G04796472Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Check stored fault messages.
Delete fault memory.