LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 7 (Engine Controls - Removal, Overhaul & Installation - 1 Of 2) >> Fuel System >> Fuel Rail & Injectors >> Removal & Installation (4-Cylinder)

Removal & Installation (4-Cylinder)

WARNING: This page does not describe the selected car, but rather 13 other vehicles, including the 1999 BMW Z3, 1999 BMW M3, 1999 BMW M Roadster, 1999 BMW M Coupe, and 1999 BMW 740iL. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove engine cover. See Figure. Pull off air duct hose and remove upper section of intake manifold collector. Remove engine front brace and rear brace.
  2. Locate pre-heater assembly (if equipped) directly under throttle body and loosen pre-heater holder until bearing surface of pre-heater comes in contact with throttle valve.
  3. Remove 9 intake manifold bolts. Lift upper section of intake manifold and pull hose off fuel pressure regulator. Pull connector plate off fuel injectors and remove clamp.
  4. Remove 2 bolts, fuel rail and fuel injectors. Remove retainer from top of fuel injector. See Fig 1. Remove fuel injector(s). To install, reverse removal procedure. Coat injector "O" rings with petroleum jelly.
Fig 1: Removing Fuel Injector Retainer
G98I11302Courtesy of BMW OF NORTH AMERICA, INC.