LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 3811 (Fuel System - Repair - F13) >> Throttle And Operation >> 13 54 030 Removing and installing/sealing throttle body (N55)

13 54 030 Removing and installing/sealing throttle body (N55)

WARNING: This page does not describe the selected car, but rather 27 other vehicles, including the 2017 BMW M6, 2017 BMW 650i xDrive, 2017 BMW 650i, 2017 BMW 640i xDrive, and 2017 BMW 640i. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: Read and comply with notes on PROTECTION AGAINST ELECTROSTATIC DISCHARGE (ESD PROTECTION) .

Necessary preliminary work: 

Unlock plug (1) and remove.

Unlock and disconnect hoses (2) and (3).

Remove tank vent valve (4) from holder in the direction of arrow and place aside.

Fig 1: Removing Tank Vent Valve From Holder
G09847011Courtesy of BMW OF NORTH AMERICA, INC.

Unlock plug (1) and remove.

Release screws (3).

Partially remove throttle body (4) and unlock tank vent line (2) and remove.

Tightening torque 13 54 1AZ .

Remove throttle body (4).

Fig 2: Identifying Tank Vent Line, Throttle Body, Screws And Plug
G09847012Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Replace sealing ring (1) of throttle assembly (2).

Fig 3: Identifying Throttle Body Sealing Ring
G04725730Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Check stored fault message.

Delete fault memory.