LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 3762 (Cooling System - Repair - F12) >> Engine Radiator With Attachment >> 17 11... Bleed and fill the cooling system for the charge air cooler with the vacuum filling unit

17 11... Bleed and fill the cooling system for the charge air cooler with the vacuum filling unit

WARNING: This page does not describe the selected car, but rather 33 other vehicles, including the 2018 BMW M6, 2018 BMW 650i xDrive, 2018 BMW 650i, 2018 BMW 640i xDrive, and 2018 BMW 640i. However, it is still accessible from the selected car via links, so may be relevant.

Special tools required: 

IMPORTANT: Lifetime coolant filling:
Never reuse used coolant!
When replacing and removing components which rely on the corrosion protection effect of the coolant, it is essential to change the coolant. The cooling system must therefore be drained and refilled.
In the case of other removal work involving the draining of part quantities of coolant, replace these quantities which have been drained with new coolant.
IMPORTANT: You must protect the alternator against contamination by coolant when carrying out repair work on the cooling circuit.
Cover alternator with suitable materials.
Failure to comply with this procedure may result in an alternator malfunction.

Note on ordering:

IMPORTANT: Risk of slipping due to coolant on the floor.
Danger of injury! 

Catch and dispose of emerging coolant in drip tray (1) and if necessary special tool 00 2 030 (universal hydraulic lifting equipment).

Recycling: 

Observe country-specific waste disposal regulations.

Fig 1: Supporting Coolant Drip Tray Using Special Tool (00 2 030)
G05476170Courtesy of BMW OF NORTH AMERICA, INC.

Graphic shows the N63, procedure for other engines identical.

IMPORTANT: Check all the coolant hoses before filling the cooling system with the vacuum filling unit.
If necessary, replace damaged and porous coolant hoses.

Vacuum filling unit consists of: 

Preconditions 

Application 

Connect filling unit (1) with a suitable adapter (2) from special tool set 17 0 100 to the charge air cooler expansion tank.

Shutoff valves (A) and (B) must be closed.

Fig 3: Identifying Filling Unit, Adapter, And Shutoff Valves
G08504220Courtesy of BMW OF NORTH AMERICA, INC.

Connect venturi nozzle (1) to filling unit (2).

Fig 4: Identifying Venturi Nozzle And Filling Unit
G08504221Courtesy of BMW OF NORTH AMERICA, INC.

Connect compressed air (1) and open shutoff valve (B).

The venturi nozzle produces a flow noise.

Fig 5: Identifying Compressed Air Hose And Shutoff Valve
G08504222Courtesy of BMW OF NORTH AMERICA, INC.

Then open shutoff valve (A) until the filling hose (1) is free of bubbles. Close shutoff valve (A) again. The filling hose (1) is vented in this way.

Fig 6: Identifying Shutoff Valve (A)
G08504223Courtesy of BMW OF NORTH AMERICA, INC.

Shutoff valve (B) remains open. Generate vacuum in cooling cycle for approx. 1 minute. The end vacuum is reached at a vacuum of -0.7 to - 0.95 bar. Green scale on the vacuum meter.

NOTE: The coolant hoses contract during vacuum build-up.

Then close shutoff valve (B) again.

Fig 7: Identifying Compressed Air Hose And Shutoff Valve
G08504222Courtesy of BMW OF NORTH AMERICA, INC.

Both shutoff valves (A) and (B) must be closed. Then seal Venturi nozzle (1).

Fig 8: Identifying Seal Venturi Nozzle And Shutoff Valves
G08504225Courtesy of BMW OF NORTH AMERICA, INC.

The cooling system must hold the vacuum for 30 seconds. If the needle in the vacuum meter falls, this indicates a leak in the cooling system.

If the vacuum remains constant, proceed with filling.

In the event of a leak, check the cooling system for the charge air cooler for leaks.

Fig 9: Identifying Cooling System Vacuum Gauge
G06889248Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: There must be sufficiently premixed coolant in the filling unit container, 1 - 2 litres more than the vehicle filling capacity.
Position the filling unit container at the same height as the coolant expansion tank.
Fig 10: Identifying Shutoff Valves
G08504227Courtesy of BMW OF NORTH AMERICA, INC.

Shut-off valve (B) remains closed during the filling process.

To fill the cooling system, open shutoff valve (A) to filling unit container.

Coolant is now added.

The filling procedure is finished when the needle in the vacuum meter is at 0 bar or no longer falls.

If necessary, reduce remaining vacuum. Open shutoff valve (B) to do so.

Remove filling unit with adapter from expansion tank.

After the cooling system has been filled with the vacuum filling unit, another bleeding procedure must be performed for the following vehicles: 

Close charge air cooler expansion tank.

Adjust coolant level to maximum.

Check cooling system for charge air cooler for leaks.