13 62 561 Removing and installing or replacing both hot film air mass meters
Overview of Activities
Preprocesses
- Reading out the fault memory
- Removing the acoustic cover
Keyprocesses
- Removing hot film air mass meters on the left and right
- Installing hot film air mass meter on the left and right
Postprocesses
- Install acoustic cover
Additional Information
Overview of Tightening Torques
| Use in Activity: 4 | |
| Hot film air mass meter to upper section of intake silencer housing | |
| 3, 5 Nm | |
General information
Preprocesses
- Reading out the fault memory
Connect diagnosis system.
Check
Read out fault memory.
Result
Fault code entry present.
- Removing the acoustic cover
Measure
Delete the fault memory, if applicable, run ABL.
Raise acoustic cover 1 .
Remove acoustic cover 1 in the direction of travel.
Keyprocesses
- Removing hot film air mass meters on the left and right
Prerequisite
Switch off ignition.
NOTE: Description is for left component only. Procedure on the right side is identical.Courtesy of BMW OF NORTH AMERICA, INC.
Unlock connector 1 and remove.
Loosen screws 2 .
Pull hot film air mass meter 3 out of upper section of intake silencer housing.
- Installing hot film air mass meter on the left and right NOTE: Description is for left component only. Procedure on the right side is identical.
Install new gasket on hot film air mass meter 3 .
Install hot film air mass meter 3 in upper section of the intake silencer housing.
Tighten down screws 2 .
TIGHTENING TORQUE SPECIFICATIONHot film air mass meter to upper section of intake silencer housing 3, 5 Nm Connect connector 1 .
Courtesy of BMW OF NORTH AMERICA, INC.
Postprocesses
- Install acoustic cover
Insert acoustic cover 1 into existing rubber guides.