Connections on EPPC
- Connection (VAC) to vacuum reservoir.
- Connection (OUT) with ring to exhaust turbocharger.
Vacuum activation, cylinders 1-4.
Detach red vacuum hose from vacuum unit.
Prepare T-piece (5) with vacuum lines for measurement.
Connect red vacuum line (1) with vacuum unit (2) and quick-release coupling (3).
Open shutoff tap (4).
Vacuum activation, cylinders 5-8.
Detach blue vacuum hose from vacuum unit.
Prepare T-piece (5) with vacuum lines for measurement.
Connect blue vacuum line (1) with vacuum unit (2) and quick-release coupling (3).
Open shutoff tap (4).
Exhaust turbocharger, cylinders 1-4.
Initial position (1) of wastegate linkage depressurized.
Wastegate valve opened.
Initial position (1) of wastegate linkage with vacuum pressure.
Wastegate valve closed.
Exhaust turbocharger, cylinders 5-8.
Initial position (1) of wastegate linkage depressurized.
Wastegate valve opened.
Initial position (1) of wastegate linkage with vacuum pressure.
Wastegate valve closed.