24 13 012 Replacing output flange shaft seal (GA6HP26Z) (N63 engine, model years 2009 through 2012)
Special tools required:
- 23 0 490
- 24 4 310
After completing work, check TRANSMISSION OIL LEVEL .
Use only approved TRANSMISSION OIL .
Failure to comply with this instruction will result in serious damage to the transmission!
Necessary preliminary tasks:
- Remove TRANSFER BOX .
Drive a hole into radial shaft seal (1) using a center punch.
Thread special tool 23 0 490 into radial shaft seal (1).
Drive out radial shaft seal (1) with impact weight (2).
Installation:
Coat sealing lips of new radial shaft seal with clean transmission oil.
Drive shaft seal firmly home with special tool 24 4 310.
Special tools required:
After completing work, check TRANSMISSION OIL LEVEL .
Use only approved TRANSMISSION OIL .
Failure to comply with this instruction will result in serious damage to the transmission!
Necessary preliminary tasks:
- Remove underbody protection at front and rear. See REMOVING FRONT UNDERBODY PROTECTION and REMOVING REAR UNDERBODY PROTECTION .
- Remove complete EXHAUST SYSTEM .
- Remove TRANSMISSION CROSSMEMBER .
- Remove PROPELLER SHAFT .
Release transmission support block from transmission.
Tightening torque 22 32 1AZ .
Grip output flange (1) with special tool 23 0 020 .
Release nut with special tool 24 2 380 .
Tightening torque 24 13 1AZ .
Installation:
Replace nut and secure with a mandrel (8 mm) by caulking.
Detach output flange from output shaft.
Remove spacer.
Attach special tool 24 2 353 to output shaft (1).
Screw in special tool 24 2 351 until it is firmly connected with radial shaft seal.
Pull out radial shaft seal by screwing in special tool 24 2 352 .
Oil sealing lip of radial shaft seal (1). Drive in radial shaft seal (1) as far as it will go using special tool 24 2 370 and adapter ring 24 2 410 .