LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 295 (Engine Electrical System - Repair Instructions) >> Starter lead >> 12 42 540 Replacing safety battery terminal (SBK) >> Installation:

12 42 540 Replacing safety battery terminal (SBK): Installation:

WARNING: This page is about a different car, the 2002 BMW M Roadster, 2002 BMW M Coupe, 2001 BMW M Roadster, and 2001 BMW M Coupe. However, it is still accessible from the selected car via links, so may be relevant.

Remove faulty fuses and carry out troubleshooting.

CAUTION: Pay attention to interface.
The repair cable is always a standard length.
The heavy-current connector of the repair cable has a larger diameter than the battery positive lead.
In some Series (e.g. E46 touring), the heavy-current connector of the repair cable can lead to installation problems.
This is the case when the interface is in the area of the close-fitting trim panels.
Find matching interface (e.g. approx. 10 cm behind rear seat backrest in E46 touring).

Lay repair cable parallel to battery positive lead.

Mark interface of battery positive lead at end of repair cable.

Fig 1: Marking Interface
G03191053Courtesy of BMW OF NORTH AMERICA, INC.

Release cable ties (1).

Disconnect plug connection (2).

Fig 2: Disconnecting Plug Connection
G03191054Courtesy of BMW OF NORTH AMERICA, INC.
CAUTION: Do not use bolt cutters or similar tools to cut through the cable.
A cable end that has been squashed flat will no longer fit into the clamping sleeve.

Saw through battery positive cable at marked point with an iron saw.

Fig 3: Cutting Cable
G03191055Courtesy of BMW OF NORTH AMERICA, INC.

Strip insulation - length (A) -from cable end.

Distance (A) = 15 mm.

Fig 4: Stripping Insulation
G03191056Courtesy of BMW OF NORTH AMERICA, INC.

Push heavy-current connector (1) over stripped cable end and screw into position.

Fig 5: Installing Heavy-Current Connector
G03191057Courtesy of BMW OF NORTH AMERICA, INC.

Push shrink-fit hose (3) over repair cable.

Screw threaded sleeve (1) of repair cable (2) to heavy-current connector.

Fig 6: Pushing Shrink-Fit Hose Over Repair Cable
G03191058Courtesy of BMW OF NORTH AMERICA, INC.

Push shrink-fit hose (1) over connecting point and shrink on with a hot-air blower (2).

Fig 7: Pushing Shrink-Fit Hose Over Connecting Point
G03191059Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Heat up shrink-fit hose until it has settled completely around the connection point.
Fig 8: View Of Shrink-Fit Hose
G03191060Courtesy of BMW OF NORTH AMERICA, INC.

When laying the repaired battery positive cable, observe the following:

NOTE: Offsetting cutting line by approx. 10 cm produces excess length of battery positive lead (1).
Lay battery positive lead (1) without kinks or abrasions. (Shown on E46 touring.)
Fig 9: Laying Battery Positive Lead
G03191061Courtesy of BMW OF NORTH AMERICA, INC.