Necessary preliminary tasks
- Remove underbody protection
- Remove center muffler (N53 only)
- Remove complete exhaust system. See EXHAUST SYSTEM - REPAIR - E91 .
- Remove heat shields
Release screws.
Tightening torque 27 00 9AZ .
Remove front propeller shaft at output flange of transfer case and tie to one side.
Installation:
Replace screws.
- Remove propeller shaft from transmission.
- Release center bearing.
- Tie propeller shaft to one side.
Tasks are described in Removing PROPELLER SHAFT .
If necessary
Release bolts and remove metal plate (1).
Disconnect plugs (1) and (2) from servomotor.
Release screws.
Remove transmission cross-member.
Tightening torque 27 00 10AZ .
Release screw connection of transfer case.
Tightening torque 27 00 9AZ .
Remove transfer case.
Installation:
Pay attention to dowel pin (1).
Grease dowel pin (1).
Apply a thin coat of grease to splines.
Grease: WEICON ANTI-SEIZE.
- Remove underbody protection
- Remove center muffler (N53 only)
- Remove complete exhaust system. See EXHAUST SYSTEM - REPAIR - E91 .
- Remove heat shields
Release screws.
Tightening torque 27 00 9AZ .
Remove front propeller shaft at output flange of transfer case and tie to one side.
Installation:
Replace screws.
- Remove propeller shaft from transmission.
- Release center bearing.
- Tie propeller shaft to one side.
Tasks are described in Removing PROPELLER SHAFT .
If necessary
Release bolts and remove metal plate (1).
Disconnect plugs (1) and (2) from servomotor.
Release screws.
Remove transmission cross-member.
Tightening torque 27 00 10AZ .
Release screw connection of transfer case.
Tightening torque 27 00 9AZ .
Remove transfer case.
Installation:
Pay attention to dowel pin (1).
Grease dowel pin (1).
Apply a thin coat of grease to splines.
Grease: WEICON ANTI-SEIZE.