Necessary preliminary work
WARNING: This page does not describe the selected car, but rather 15 other vehicles, including the 2015 BMW Alpina B7L, 2015 BMW Alpina B7, 2014 BMW Alpina B7L, 2014 BMW Alpina B7, and 2013 BMW Alpina. However, it is still accessible from the selected car via links, so may be relevant.
- Removing all PISTONS
Install new connecting rod bearing shells.
Install one blue bearing shell (1) and one red bearing shell (2) in each connecting rod.
Install PISTON .
Installation note:
The bearing shells on the connecting rod are coded.
Connecting rod bearing cap (1): the red bearing shell is fitted and the fastening notches are on the left and right sides of the bearing shell (see arrows).
Connecting rod (2): the blue bearing shell is fitted and the fastening notches are one side of the bearing shell (see arrows).