LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 2251 (Manual Transmission - E92/93) >> Complete transmission >> 23 00 037 Installing replacement transmission (GS6-53BZ) S65

23 00 037 Installing replacement transmission (GS6-53BZ) S65

WARNING: This page is about a different car, the 2010 BMW M3, 2009 BMW M3, and 2008 BMW M3. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: After completion of work, check transmission fluid level. 
Use only the approved transmission fluid.  Refer to 00 11 229 CHANGING / TOPPING UP / CHECKING GEAR OIL IN MANUAL TRANSMISSION and MANUAL TRANSMISSION - OPERATING FLUIDS .

Failure to comply with this instruction will result in serious damage to the transmission.

Recycling: 

Catch and dispose of escaping transmission fluid.

Observe country-specific waste-disposal regulations

Necessary preliminary tasks: 

Convert shift rod joint.

Push back retaining ring (1) and drive out dowel pin (2).

Fig 1: Pushing Back Retaining Ring
G04755750Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Check damping disk (6) for damage and replace if necessary.
Fig 2: Identifying Damping Disk
G04726030Courtesy of BMW OF NORTH AMERICA, INC.

Convert following parts from previous transmission to new transmission.

Add final details to vehicle.

Check oil level.

Installation: 

Observe greasing specification.  Use only the approved transmission fluid.  Refer to MANUAL TRANSMISSION - OPERATING FLUIDS .