LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 2239 (Convertible Top - Repair - M3) >> Folding roof >> 54 37 ... Gauging coupling fastener (without removing and installing roof module) >> Gauge, coupling fastener

Gauge, coupling fastener

WARNING: This page is about a different car, the 2010 BMW M3, 2009 BMW M3, and 2008 BMW M3. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Coupling fastener must not be screwed into place for adjustment work (barrel screws move freely).

Slacken screw for rubber stop (1) and pull back.

Fig 1: Slacken Screw For Rubber Stop (1) And Pull Back
G06181081Courtesy of BMW OF NORTH AMERICA, INC.

Insert special tool 54 0 130 in coupling fastener.

Screw gauge for coupling fastener 54 0 131 on left and 54 0 132 right onto basic gauge with special tool 00 9 251.

Tightening torque: 6 Nm

Fig 2: Locating Screw Gauge For Coupling Fastener
G06181082Courtesy of BMW OF NORTH AMERICA, INC.

Turn L-piece (2) under stop screw (3) of coupling fastener.

Adjust coupling fastener as follows: 

Set stop screw (3) with adjusting screw (1) such that it comes up against stop (4).

Bring barrel screws into contact with special tool 54 0 180 in conjunction with 00 9 450.

Tightening torque: 0.2 Nm (=20 cNm).

Fig 3: Identifying Adjusting Screw And Stop Screw With L-Piece
G06181083Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Observe screwing sequence of coupling fastener:

Refer to INSTALLING ROOF MODULE .

  1. Z-direction (coupling fastener to screwing plate, rollover protection system)
  2. Y-direction (coupling faster to side panel)
  3. X-direction (roof frame to partition wall)

Tightening torque: 54 37 22AZ, see 54 37 POWER CONVERTIBLE TOP .