64 53 691 Replacing line from evaporator to condenser (N52)
Refrigerant circuit is under high pressure!
Follow safety instructions for handling R134a refrigerant.
Avoid contact with refrigerant and refrigerant oil.
Follow safety instructions for handling refrigerant oil.
Restart engine only when A/C system has been correctly filled.
Follow instructions for opening and replacing parts in refrigerant circuit.
If A/C system is opened for more than 24 hours:
Replace desiccant insert for A/C system
Necessary preliminary tasks:
- Drawing off, evacuating and filling the A/C system are not included in the time value given for this work operation
- Remove fresh air duct
- Release expansion tank and place to one side
Do not place front panel center section (2) on jump start terminals.
Do not kink Bowden cables for engine hood locking.
Release screws (1).
Remove front panel center section (2) in direction of arrow and place to one side.
Feed out rubber grommet (1).
Release nut (2) and detach refrigerant lines (3 and 4) in direction of arrow.
Installation:
Make sure rubber grommet (1) is correctly seated.
Replace sealing rings and moisten with refrigerant oil.
Tightening torque 64 53 7AZ . See 53 CONDENSER AND DRYER .
Expose refrigerant line up to condenser connection.
Release nuts (1) and remove holder (2).
Release screw (1) and remove refrigerant line (2).
Feed refrigerant line (2) out of engine compartment.
Installation:
Replace sealing rings and moisten with refrigerant oil.
Tightening torque 64 53 6AZ . See 53 CONDENSER AND DRYER .
Replacement:
Modify safety pressure switch.
After installation:
- Evacuate and fill A/C system