23 00 038 Installing exchange transmission (GS6-17BG/DG)
WARNING: This page does not describe the selected car, but rather 14 other vehicles, including the 2013 BMW 328xi, 2013 BMW 328i, 2012 BMW 328xi, 2012 BMW 328i, and 2011 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
After completion of work, check transmission fluid level.
Use only the APPROVED TRANSMISSION FLUID
Failure to comply with this instruction will result in serious damage to the transmission.
Recycling:
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations
Necessary preliminary tasks:
- Drain gear oil at oil drain plug. For tightening torque refer to 23 00 4AZ in 00 COMPLETE TRANSMISSION
- Remove Gearbox
Convert shift rod joint.
Push back retaining ring (1) and drive out dowel pin (2).
NOTE:
Check damping disk (6) for damage and replace if necessary.
Convert following parts from previous transmission to new transmission.
- Release BEARING AND RELEASE LEVER
- Ball pin and spring wire clip
- Studs for clutch slave cylinder
- Reversing light switch, for tightening torque refer to 23 41 5AZ in 23 41 EXTERNAL GEARSHIFT COMPONENTS .
Add final details to vehicle.
Check oil level.
Installation:
Observe Greasing Specification.