LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1166 (Manual Transmission - Repair - E92/E93) >> Transmission In General >> 23 00 036 Installing exchange transmission (GS6-37BZ) AWD >> Necessary preliminary tasks

Necessary preliminary tasks

WARNING: This page does not describe the selected car, but rather 14 other vehicles, including the 2013 BMW 328xi, 2013 BMW 328i, 2012 BMW 328xi, 2012 BMW 328i, and 2011 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.

Convert following parts from previous transmission to new transmission:

Convert shift rod joint.

Push back retaining ring (1) and drive out dowel pin (2).

Fig 1: Removing Dowel Pin From Shift Rod
G04726029Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Check damping disc (6) for damage and replace if necessary.
Fig 2: Identifying Damping Disk
G04755567Courtesy of BMW OF NORTH AMERICA, INC.

Add final details to vehicle.

Check oil level.

Installation: 

Observe greasing specification.