LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1083 (Engine Electrical System - Repair - E90/E91, Z4) >> 14 Electronic switching >> 12 14 521 Replacing crankshaft pulse generator (N52, N52K, N51, N53)

12 14 521 Replacing crankshaft pulse generator (N52, N52K, N51, N53)

WARNING: This page does not describe the selected car, but rather 14 other vehicles, including the 2008 BMW Z4, 2008 BMW 328xi, 2008 BMW 328i, 2008 BMW 323i, and 2007 BMW Z4. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: Aluminium-magnesium materials.

No steel screws/bolts may be used due to the threat of electrochemical corrosion.

A magnesium crankcase requires aluminium screws/bolts exclusively.

Aluminium screws/bolts must be replaced each time they are released. 

The end faces of aluminium screws/bolts are painted blue for the purposes of reliable identification.

Jointing torque and angle of rotation must be observed without fail (risk of damage  ).

Necessary preliminary tasks: 

NOTE: Installation location of pulse generator for crankshaft is underneath starter motor.

Preparatory tasks:

Detach plug (1) from crankshaft pulse generator (2).

Release screw.

Installation: 

Replace aluminium screws. 

For tightening torque refer to 12 14 2AZ in 12 14 ELECTRONIC SHIFT UNITS OR CONTROL UNITS .

Withdraw pulse generator (2) from crankcase.

Installation: 

Replace sealing ring.

Fig 1: Identifying Plug, Screw And Crankshaft Pulse Generator
G04725653Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Check stored fault messages.

Now clear the fault memory.