41 11 023 Front Section Of Engine Support To Left Wheel Arch Replacement

WARNING: This page is about a different car, the 2010 BMW 550i, 2009 BMW 550i, and 2008 BMW 550i. However, it is still accessible from the selected car via links, so may be relevant.

The reduced-weight aluminum front end structure (GRAV) is used on this vehicle.

Observe specific procedure  .

Place vehicle on straightening bench.

Following new body parts are required:

The engine carrier is supplied with longer bolts for the E60 and E61. The bolts do not have to be shortened.

Fig 1: Wheel Arch, Support Carrier, Engine Carrier And Reinforcement Bracket
G05503190Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in areas (1) to (3).

Installation: 

Use 3 rivets (size 13) in area (1).

Use 2 rivets (size 13) in area (4).

Use 3 rivets (size 13) in area (3).

Fig 2: Open Rivet Joints In Areas
G05503191Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Engine carrier has been blanked out for purposes of clarity.

Spot-drill rivets in areas (1) and (2) from protruding rear side or grind and punch through.

Installation: 

Use 5 rivets (size 13) in areas (1).

Use 2 rivets (size 13) in areas (1).

Fig 3: Spot-drill rivets in areas (1) and (2) from protruding rear side or grind and punch through
G05503192Courtesy of BMW OF NORTH AMERICA, INC.

Spot-drill rivets in area (1) from protruding rear side or grind and punch through.

Fig 4: Spot-Drill Rivets In Area (1)
G05503193Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in areas (1) to (3).

Installation: 

Use 5 rivets (size 13) in area (1).

Use 4 rivets (size 13) in area (2).

Use 3 rivets (size 13) in area (3).

Use 4 rivets (size 13) in area (4).

Use 7 rivets (size 13) in area (5).

Fig 5: Open Rivet Joints In Areas
G05503194Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in areas (1) to (3).

As a rule, part of the punch rivet remains in the rear engine carrier in area (2). Do not drill out remnants. Set blind rivets next to punch rivets.

Open weld joint in area (1).

Installation: 

Use 4 rivets (size 13) in area (1).

Use 5 rivets (size 13) in area (2)

Use 6 rivets (size 13) in area (3).

Install 2 EMC screws  in area (1).

Fig 6: Open Rivet Joints In Areas (1) To (3)
G05503195Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in area (1) to (3).

Open weld joint in area (4).

Installation: 

Use 3 rivets (size 13) in area (1).

Use 6 rivets (size 13) in area (2).

Use 1 rivet (size 13) in area (3).

Install 2 EMC screws  in area (2).

Fig 7: Rivet Joint Areas
G05503196Courtesy of BMW OF NORTH AMERICA, INC.

Drill out rivet joint in area (1).

Installation: 

Use 1 rivet (size 15) in area (1).

Fig 8: Drill Out Rivet Joint
G05503197Courtesy of BMW OF NORTH AMERICA, INC.

Cut open engine carrier in area (2) from opposite side and open rivets.

Installation: 

Adjust new part to fit with straightening attachment or universal mount.

Drill holes for rivets  .

Use 6 rivets (size 13) in areas (1).

For accessibility reasons, rivet retaining brackets in areas (1) to engine carrier first.

Rivets are omitted in area (2).

Fig 9: Cut Engine Carrier In Area (2) From Opposite Side And Open Rivets
G05503198Courtesy of BMW OF NORTH AMERICA, INC.

Open rivet joints in areas (1) and (2).

As a rule, part of the punch rivet remains in the units compartment partition wall in areas (1) and (2). Drill out remnants.

Installation: 

Carry over bores from units compartment partition wall to new part in area (2).

Use 3 rivets (size 13) in area (1).

Use 2 rivets (size 13) in area (2).

Fig 10: Open Rivet Joints In Areas (1) And (2)
G05503199Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joints in areas (1) and (2).

Installation: 

If necessary, replace brazed seams with MAG weld seams in area (1).

Use 2 rivets (size 13) in area (3).

Fig 11: Open Weld Joints (1) And (2); Use Rivets In Area (3)
G05503200Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joints in areas (1).

Fig 12: Open Weld Joints (1)
G05503201Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joints in area (1).

Mark severance cut according to measurement a and cut inside A-pillar.

Measurement a = 47 mm from center of bore.

Fig 13: Open Weld Joints In Area (1)
G05503202Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: When replacing right wheel arch:
Measurement a = 65 mm from center of bore.
Measurement b = 20 mm
Fig 14: Measurements "a" And "b"
G05503203Courtesy of BMW OF NORTH AMERICA, INC.

Different riveting-down elements, depending on the equipment specification, must be mounted on the new component.

Preparation of new part: 

Mark severance cut (1) according to vehicle. Cut outer metal sheet only.

Drill out metal sheet in areas (2).

Installation: 

Adjust new part to fit with straightening attachment or universal mount.

Let parts overlap 10 mm at severance cut (1).

Weld new component from inside and outside over entire length (from outside if accessible).

Drill holes for rivets  .

Bond  all new parts.

Rivet  all new parts.

Fig 15: Drill Out Metal Sheet In Area (2)
G05503204Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 8 rivets (size 13) in areas (1).

Use 6 rivets (size 13) in areas (2).

Use 4 rivets (size 13) in areas (3).

Fig 16: Use Rivets In Areas (1-3)
G05503205Courtesy of BMW OF NORTH AMERICA, INC.

Right side only:

Installation: 

Use 2 rivets (size 13) in areas (1).

Fig 17: Use 2 Rivets In Area (1)
G05503206Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Use 2 EMC screws  in each case (4 x in total) in areas (1) and (2).

Fig 18: EMC Screws
G05503207Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Seal new component in area (1) with sealing compound.

Fig 19: Seal Component Area
G05503208Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

AWD only: 

After painting on both sides of car, stick zinc foil (1) to center.

bolting point (2) of front axle carrier.

Fig 20: Bolting Point (2) Of Front Axle Carrier
G04755873Courtesy of BMW OF NORTH AMERICA, INC.