1. General notes
- Bonding at room and object temperature of 18 to 25 °C.
- Newly painted parts may only be bonded after a drying time of at least 24 hours.
- Optimal attachment of the film to the background surface is achieved after approx. 48 hours. Film must not be exposed to mechanical strain beforehand (car wash, strength test, etc.).