Bench Test
- Connect ohmmeter leads to sending unit ground terminal and variable resistor terminal. Position float rod against empty stop. If ohmmeter reading is not 245-255 ohms, replace sending unit.
- If ohmmeter reading is 245-255 ohms, move float between full and empty stops. Ohmmeter reading should increase and decrease smoothly, without jumping or hesitating, between 18-255 ohms. If ohmmeter reading is more than 255 ohms, or less than 18 ohms, or if resistance reading jumps or hesitates throughout the arm swing, replace sending unit.
- Move float rod to full stop position. Ohmmeter reading should be 18-20 ohms. If reading is not to specification, replace sending unit. Before reinstalling or installing a new sending unit in fuel tank, connect wiring harness to sending unit and move rod to empty and full stops to check fuel gauge readings.