Normal Operation
WARNING: This page is about a different car, the 2009 Mercury Milan, 2009 Lincoln MKZ, and 2009 Ford Fusion. However, it is still accessible from the selected car via links, so may be relevant.
When the accessory delay relay is energized, voltage is supplied from the smart junction box (SJB) to the door lock control switches (Fusion, Milan), the roof opening panel (if equipped) and the cigar lighter (MKZ) through circuit CBP02 (GN).
This pinpoint test is intended to diagnose the following:
- Fuse
- Wiring, terminals or connectors
- SJB