Camshaft Timing & Belt Replacement: Installation
- Starting at the crankshaft install new timing belt over cogged sprockets in a counterclockwise direction. Keep belt span from crankshaft to camshaft tight as belt is installed over remaining sprockets.
- Loosen belt tensioner bolt about 1/2 turn and allow tensioner to snap against belt. Then tighten one of the tensioner bolts.
- With the crankshaft pulley installed, hold pulley stationary and tighten pulley attaching bolts. Rotate crankshaft 2 complete revolutions and ensure timing marks are aligned.
- Hold crankshaft from turning using wrench T81P-6312-A (or equivalent). With camshaft held, turn cam sprocket counterclockwise, using holding tool (D81P-6256-A or equivalent) and a torque wrench. When torque on cam sprocket reads 27-32 ft. lbs. (37-44 N.m) for new belt or 10 ft. lbs. (14 N.m) for a used belt, tighten belt tensioner attaching bolts.NOTE: Do not apply torque to camshaft sprocket attaching bolt. Apply torque to hex on sprocket.
- When valve timing is correct, crankshaft keyway should point to 12 o'clock position and camshaft to 6 o'clock position. See Fig. 10.