LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2025 >> eSprinter Base, _NA_ >> Repair and Diagnosis >> External Pages >> Different car >> Section 2751 (Automatic Transmission - 5R110W (TORQSHIFT(R)) -- F250-F550 Super Duty) >> In-Vehicle Repair >> Line Pressure Control Solenoid - PC-A >> Installation

Line Pressure Control Solenoid - PC-A: Installation

WARNING: This page is about a different car, the 2010 Ford Pickup, 2010 Ford F550 Super Duty, 2010 Ford F450 Super Duty, and 2010 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
  1. Assemble the main control valve body.
    1. Install the PCA  and install the E clip.
    2. Push the transmission internal harness connector through the solenoid body and twist the connector, locking it into place.
    3. Install the SSPCC  back into place and install the E clip.
    4. Connect the electrical connectors to the PCA  and the SSPCC  .
    5. Install the wire harness to solenoid body and tighten the bolts.
      Fig 1: Identifying Wire Harness-To-Solenoid Body Bolts
      G06140655Courtesy of FORD MOTOR CO.
  2. Install the solenoid body electrical connector O-ring seal, lubricate it with transmission fluid.
    Fig 2: Locating Solenoid Body Electrical Connector O-Ring Seal
    G06140652Courtesy of FORD MOTOR CO.
  3. Install the transmission main control valve body. For additional information, refer to SOLENOID BODY ASSEMBLY .