LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2025 >> eSprinter Base, _NA_ >> Repair and Diagnosis >> External Pages >> Different car >> Section 2370 (Engine Mechanical - 6.8L (3V) -- F250-F550 Super Duty) >> Disassembly And Assembly Of Subassemblies >> Intake Manifold Assembly >> Assembly

Intake Manifold Assembly: Assembly

WARNING: This page is about a different car, the 2009 Ford Pickup, 2009 Ford F550 Super Duty, 2009 Ford F450 Super Duty, and 2009 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE: Lubricate the new O-ring seals with clean engine oil prior to installation.
  1. Install 2 new O-ring seals on each of the fuel injectors.
  2. Assemble the fuel injectors onto the fuel rail and install the locking clips.
  3. Install the fuel rail and fuel injector assembly onto the intake manifold.
  4. Install the 6 fuel rail bolts.
    • Tighten to 10 Nm (89 lb-in).
  5. Position the TB spacer.
  6. Install the 2 upper TB spacer bolts in 2 stages:
    • Stage 1: Tighten to 7 Nm (62 lb-in).
    • Stage 2: Tighten an additional 90 degrees.
  7. Install the 4 lower TB spacer bolts in 2 stages:
    • Stage 1: Tighten to 10 Nm (89 lb-in).
    • Stage 2: Tighten an additional 90 degrees.
  8. Install a new gasket and the TB. Tighten the 4 bolts in 2 stages:
    • Stage 1: Tighten to 9 Nm (80 lb-in).
    • Stage 2: Tighten an additional 90 degrees.
  9. Position the IMRC actuator and install the 3 bolts.
    • Tighten to 10 Nm (89 lb-in).
  10. Install the IMRC rod C-clip.