LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2024 >> eSprinter Base, _NA_ >> Repair and Diagnosis >> External Pages >> Different car >> Section 2368 (Engine Mechanical - 5.4L (3V) -- F250-F550 Super Duty) >> In-Vehicle Servicing >> Valve Cover - LH >> Installation

Valve Cover - LH: Installation

WARNING: This page is about a different car, the 2009 Ford Pickup and 2009 Ford Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE: If the valve cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with Silicone Gasket Remover and Motorcraft Metal Surface Prep. Follow the directions on the packaging. Allow to dry until there is no sign of wetness, or 4 minutes, whichever is longer. Failure to follow this procedure may cause future oil leakage.
  1. Apply a bead of Silicone Gasket and Sealant in 2 places where the engine front cover meets the cylinder head.
  2. Fig 1: Applying Bead Of Silicone Gasket And Sealant In 2 Places Where Engine Front Cover Meets Cylinder Head
    G03919870Courtesy of FORD MOTOR CO.
  3. Position the LH valve cover and a new gasket on the cylinder head and tighten the bolts in the sequence shown.
    • Tighten to 10 Nm (89 lb-in).
  4. Fig 2: Tightening LH Valve Cover In Sequence
    GF0002744Courtesy of FORD MOTOR CO.
  5. Position the intake manifold vacuum tube assembly onto the support bracket and the valve cover stud.
  6. Connect the VCT solenoid electrical connector and the wiring harness retainers.
  7. Connect the radio ignition interference capacitor electrical connector.
  8. Connect the intake manifold vacuum tube hose to the brake booster.
  9. NOTE: Verify that the ignition coil spring is correctly located inside the ignition coil boot and that there is no damage to the tip of the boot.
  10. Install the 4 LH ignition coils and the 4 bolts.
    • Apply a light coat of dielectric compound to the inside of the ignition coil boots prior to installation.
    • Tighten to 6 Nm (53 lb-in).
  11. Connect the 4 LH ignition coil electrical connectors.
  12. Position the 2 EVAP system tubes and connect the quick connect couplings. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION - GASOLINE AND DIESEL article.
  13. Install the oil level indicator and tube. For additional information, refer to Oil Level Indicator and Tube .
  14. Position the PCV tube and connect the quick connect couplings. For additional information, refer to FUEL SYSTEM - GENERAL INFORMATION - GASOLINE AND DIESEL article.
  15. Connect the degas bottle coolant outlet hose.
  16. Install the degas bottle assembly. For additional information, refer to ENGINE COOLING article.
  17. Install the air cleaner outlet pipe. For additional information, refer to INTAKE AIR DISTRIBUTION AND FILTERING article.