Front Roof Frame Installation - Ar65.20-P-1006-05ME
Model 167.1
The following steps are shown on the left side of the vehicle and must be accomplished analogously on the right side of the vehicle.
The higher-level service document as well as the safety information in the service document must be observed.
- Install, fit and fix in place roof frame (1).
- Drill rivet holes on mounting console (2) with Ø 6.7 mm (area D).
- Remove roof frame (1).
- Deburr rivet holes on roof frame (1) and the mounting console (2) on both sides.
- Remove drilling chips.
- Coat insides of riveted joints with zinc dust paint.
- Install and fix in place roof frame (1).
- Rivet the roof frame (1) with rivet Ø 6.5x12.5 (area E).
- Roof frame (1)
(area F).
- The roof frame (1) and mounting console (2)
(area G).
Perform inert gas welding at intervals and allow to cool down in between. This reduces heat distortion.
- Bend sheet metal lug (arrow).