Front Roof Frame Preparation For Installation - Ar65.20-P-1006-04S
Model 223.0/1/9
The next steps are shown on model 223.1.
The superordinate service document as well as the safety information in the service document must be observed.
- Mark separating points on roof frame upper section (1) and separate (areas A, B).
Transfer separation points from vehicle.
- Grind mating surfaces on roof frame upper section (1) down to bare metal in cross-hatched areas.
Underside of roof frame upper section (1)
- Grind mating surfaces on roof frame upper section (1) down to bare metal in cross-hatched areas.
Observe pretreatment of bonding surfaces.
- Remove grinding dust.
- Mark separating points on roof frame lower section (2) and separate (areas C, D).
Transfer separation points from vehicle.
- Grind mating surfaces on roof frame lower section (2) down to bare metal in cross-hatched areas.
Observe pretreatment of bonding surfaces (areas E).
Underside of roof frame lower section (2)
- Grind mating surfaces on roof frame lower section (2) down to bare metal in cross-hatched areas.
Observe pretreatment of bonding surfaces (areas F).
- Remove grinding dust.