Prepare Bottom Locking Lug On The D-Pillar - Ar64.30-S-0900-02E
Model 447, 448
- Expose spot welds on new bottom locking lug on D-pillar (1) and cut out (area A).
- Grind mating surfaces on section of bottom locking lug n D-pillar (2) down to bare metal in crosshatched areas.
Sand down spot weld flanges to bare metal on both sides.
- Remove shavings and drill chips.
- Coat insides of spot weld flanges with zinc dust paint.