LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2021 >> GT 53 AMG >> Repair and Diagnosis >> Collision >> Body Panels >> Collision - Front End And Fire Wall - 290 Chassis >> Front End And Fire Wall Body Repair >> Suspension Strut Tower Prepare For Installation - Ar62.20-P-1232-03FR

Suspension Strut Tower Prepare For Installation - Ar62.20-P-1232-03FR

Model 257, 290 

IMPORTANT The following operation steps are shown on the left side of the vehicle on model 257. In case of damage on the right side of the vehicle, these steps must be performed analogously.

Additional information can be found in the superordinate service document.

The safety information in the superordinate service document must be observed.

  1. Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.

    IMPORTANT Sand down spot weld flanges to bare metal on both sides.

  2. Remove grinding dust.

    IMPORTANT Observe pretreatment of bonding surfaces.

    G16554952Courtesy of MERCEDES-BENZ USA
  3. Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.
  4. Remove grinding dust.

    IMPORTANT Observe pretreatment of bonding surfaces.

    G16554953Courtesy of MERCEDES-BENZ USA