Suspension Strut Tower Prepare For Installation - Ar62.20-P-1232-03FR
Model 257, 290
The following operation steps are shown on the left side of the vehicle on model 257. In case of damage on the right side of the vehicle, these steps must be performed analogously.
Additional information can be found in the superordinate service document.
The safety information in the superordinate service document must be observed.
- Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.
Sand down spot weld flanges to bare metal on both sides.
- Remove grinding dust.
Observe pretreatment of bonding surfaces.
- Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.
- Remove grinding dust.
Observe pretreatment of bonding surfaces.