LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2021 >> E350 Base >> Repair and Diagnosis >> Engine Performance >> Tune-Up >> Mixture Formation - 213 Chassis 3 Of 5 >> Testing & Repair >> Remove/Install Engine Management (MCM) Control Unit Holder - AR07.08-P-7016MNE

Remove/Install Engine Management (MCM) Control Unit Holder - AR07.08-P-7016MNE

Engine 177 in model 213 

G13744496Courtesy of MERCEDES-BENZ USA
Fig 1: Engine Management (MCM) Control Unit Holder/Bracket Components Location - Engine 177 In Model 213
G13744497Courtesy of MERCEDES-BENZ USA
G13744498Courtesy of MERCEDES-BENZ USA
CAUTION Risk of injury  caused by scraping or cutting body parts on sharp vehicle parts Always wear protective gloves when working on or near sharp and non-deburred vehicle parts.
Deburr repair panels.
AS00.00-Z-0017-01A
  Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
REMOVINGINSTALLING Remove/install     
1 Remove engine management control unit and place to one side with coolant lines connected   AR07.08-P-7013MNE 
2 Unlock and disconnect the electrical connections of the charging pressure control pressure converter (Y31/5)    
3 Remove screw/bolts (4) TORQUE SPECIFICATION M6X1 *BA00.10-P-1002-04A 
4 Unlock and disconnect the electrical plug connection of the ignition coil at cylinders 1 +2 (T4)    
5 Unlock and disconnect the electrical plug connection of the ignition coil at cylinders 3+4 (T4/1)    
6 Loosen the clip (18) at the high-pressure line    
7 Remove the clip (7) from the engine management control unit bracket (5)    
8 Remove the clip (11) from the engine management control unit bracket (5)    
9 Remove the clip (17) from the engine management control unit bracket (5)    
10 Remove the clip (20) at the engine suspension lug    
11 Remove the screw (14) TORQUE SPECIFICATION M6X1 *BA00.10-P-1002-04A 
12 Unlock and disconnect the electrical connection of the CAMTRONIC actuator at the input to the cylinder 2 (Y49/11)    
13 Unlock and disconnect the electrical plug connection (21)    
14 Unlock and disconnect the electrical plug connection (19) of the fuel injector at cylinder 4 (Y76/4)    
15 Unlock and disconnect the electrical plug connection of the right-hand charge air temperature sensor (B17/15)    
16 Remove the vacuum hoses (10) from the boost pressure positioner (Y77/1)    
17 Remove screws/bolts (8) TORQUE SPECIFICATION M6X1 *BA00.10-P-1002-04A 
18 Unclip the bracket (12) from the engine suspension lug    
19 Put the engine wiring harness (1) and the cable duct (2) to one side    
20 Remove the engine management control unit bracket (5)    
21 Remove the elastomer bearings (6) at the engine management control unit bracket (5) When replacing the engine management control unit bracket (5).
INSTALLATION IMPORTANT Coat the elastomer bearings (6) with antifriction paste.
 
    Antifriction paste, rubber parts 2.5 kg, DBL 6867.00
If the elastomer bearings (6) are damaged or missing
↓
Replace the elastomer bearings (6).
*BR00.45-Z-1002-06A 
22 Remove the boost pressure positioner (Y77/1) from the engine management control unit bracket (5) When replacing the engine management control unit bracket (5).  
23 Remove the clamp (9) for the top engine cover When replacing the engine management control unit bracket (5).  
24 Install in the reverse order    
METRIC SCREWS/BOLTS AND NUTS AS PER MBN 10 105, 10 143

Number Designation 8.8 10.9
BA00.10-P-1002-04A M6X1 Nm 9 13
REPAIR MATERIALS

Number Designation Order number
BR00.45-Z-1002-06A Antifriction paste, rubber parts 2.5 kg, DBL 6867.00 A 000 989 01 60