Wiring Diagram For Electric Refrigerant Compressor - PE83.55-P-2000-97FCB
WARNING: This page is about a different car, the 2023 Mercedes-Benz GLC300, 2022 Mercedes-Benz GLC300, 2021 Mercedes-Benz GLC300, 2020 Mercedes-Benz GLC350e, and 2020 Mercedes-Benz GLC300. However, it is still accessible from the selected car via links, so may be relevant.
Model 253 (except 253.99) as of model year 2020
with code ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN)) A9/5
| Code: | Designation: | Position: |
|---|---|---|
| A0 | Use of wiring diagrams | 48L |
| A9/5 | Electric refrigerant compressor | 4A |
| A9/5 | Electric refrigerant compressor | 12A |
| A9/5 | Electric refrigerant compressor | 19A |
| A9/5 | Electric refrigerant compressor | 31A |
| A9/5 | Electric refrigerant compressor | 35A |
| A9/5m1 | Refrigerant compressor electric motor | 16A |
| A9/5n1 | Refrigerant compressor control unit and power electronics | 17A |
| F1/3 | Passenger-side A-pillar fuse box | 6L |
| F1/3MF2 | Multiple fuse 2 | 5K |
| LIN B8-2 | Climate control LIN 2 | 18K |
| N129/1 | Power electronics control unit | 15L |
| N22/1 | Climate control control unit | 19L |
| S7 | High-voltage disconnect device | 10L |
| X18/28 | Left cockpit/engine compartment electrical connector | 18E |
| X25/7 | Engine compartment/frame floor assembly electrical connector | 5E |
| X30/62 | Power electronics control unit electrical connector | 13H |
| X999 | High-voltage power distributor | 25L |
| Z68/24z1 | Connector sleeve, data line for climate control LIN 2 | 18G |
| Z68/29z1 | Connector sleeve, ground line for climate control LIN 1 and climate control LIN 2 | 19G |