Wiring Diagram Control Unit DC/AC Converter - PE54.10-P-2103FBA
WARNING: This page is about a different car, the 2023 Mercedes-Benz GLC300, 2022 Mercedes-Benz GLC300, 2021 Mercedes-Benz GLC300, 2020 Mercedes-Benz GLC350e, and 2020 Mercedes-Benz GLC300. However, it is still accessible from the selected car via links, so may be relevant.
Model 205
up to model year 2019
with code U67 (230 V socket in interior compartment)
Control unit N24/3
Model 253 (except 253.99)
up to model year 2020
with code U67 (230 V socket in interior compartment)
| Wiring diagram for control unit DC/AC converter | PE54.10-P-2103-97FBA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28FBA | ||
| Use of wiring diagrams | OV00.01-P-1901-03FBA | ||
| Search aid for all electrical components | OV00.01-P-1909FBA | ||
| Location and assignment of line and plug connectors | GF00.19-P-1000FBA | ||
| Location and assignment of ground points | GF00.19-P-2000FBA | ||
| Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness) | GF00.19-P-3000FBA |