Wiring Diagram For Battery Management Control Unit - PE54.10-P-2104FBA
WARNING: This page is about a different car, the 2023 Mercedes-Benz C300, 2022 Mercedes-Benz C300, 2021 Mercedes-Benz C300, 2020 Mercedes-Benz C300, and 2019 Mercedes-Benz C300. However, it is still accessible from the selected car via links, so may be relevant.
Model 205
up to model year 2019
with code ME04 (Mild hybrid drive)
except code ME06 (Hybrid drive 60 kW variant (incl. plugin))
Control unit N82/2
| Wiring diagram for battery management control unit | PE54.10-P-2104-97FBA | ||
| Location and assignment of line and plug connectors | GF00.19-P-1000FBA | ||
| Location and assignment of ground points | GF00.19-P-2000FBA | ||
| Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness) | GF00.19-P-3000FBA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28FBA | ||
| Use of wiring diagrams | OV00.01-P-1901-03FBA | ||
| Search aid for all electrical components | OV00.01-P-1909FBA |