Prepare Suspension Strut Tower For Installation - Ar62.20-P-1232-03LF
MODEL 217
MODEL 222
The following steps are shown on the left side of the vehicle and must be accomplished analogously on the right side in the event of damage.
- Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.
Shown on MODEL 222
- Grind mating surfaces on suspension strut tower (1) down to bare metal in crosshatched areas.
- Remove grinding dust.
Observe pretreatment of bonding surfaces.
Shown on MODEL 222
- Grind mating surfaces on front mounting console (2) down to bare metal in the crosshatched areas.
- Remove grinding dust.
MODEL 222
without CODE Z07 (Top protection)
Observe pretreatment of bonding surfaces.
Shown on MODEL 222
- Grind mating surfaces on rear mounting console (3) down to bare metal in the crosshatched areas.
- Remove grinding dust.
MODEL 222
without CODE Z07 (Top protection)
Observe pretreatment of bonding surfaces.
Shown on MODEL 222