Perform Protective Earth Conductor And Insulation Resistance Test - AR54.10-P-0019-01LVH

Model 253.354/954 

  Risk of death  when working on component parts and systems with U >= 30 V alternating voltage (AC) or U >= 60 V direct voltage (DC) Do not touch damaged or defective live component parts and lines or non-insulated electrical connections and lines. AS00.00-Z-0035-01A
  General information on handling vehicles with high-voltage on-board electrical system and/or lithium-ion battery and/or gaseous-fuel drive system   AH00.00-Z-0300-01A
  Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
  Notes on battery   AH54.10-P-0001-01A
HIGH-VOLTAGE BATTERY

Number Designation Model 253 with code ME02 (Fuel cell) Model 253 with code ME05 (Hybrid drive 85 kW-94 kW variant (including plug-in))
BA54.10-P-1004-02H Screw/bolt, potential equalization line to high-voltage battery Nm 16 16
HIGH-VOLTAGE BATTERY

Number Designation Model 253 with code ME02 (Fuel cell) Model 253 with code ME05 (Hybrid drive 85 kW-94 kW variant (including plug-in))
BA54.10-P-1005-02H Nut, potential equalization line to body Nm 16 16
HIGH-VOLTAGE BATTERY

Number Designation Model 253 with code ME02 (Fuel cell) Model 253 with code ME05 (Hybrid drive 85 kW-94 kW variant (including plug-in))
BA54.10-P-1012-02H Bolt, protective earth conductor to charger Nm - 9
HIGH-VOLTAGE BATTERY

Number Designation Model 253 with code ME02 (Fuel cell) Model 253 with code ME05 (Hybrid drive 85 kW-94 kW variant (including plug-in))
BA54.10-P-1013-02H Screw/bolt, potential equalization line to charger Nm 9 9

NOTES The resistance/insulation resistance measurement should only be performed after the vehicle has been de-energized.

Otherwise, the test results may be falsified.

NOTES The resistance/insulation resistance measurement on the high-voltage component must never be performed between HV+ (positive) and HV- (negative).

The high-voltage component can otherwise be damaged.

NOTES A resistance/insulation resistance tester is used for the measurement.

NOTES Carefully connect the probes of the resistance/insulation resistance tester to the high-voltage connections.

Otherwise the high-voltage connections may be damaged.

  1. Check that testing tools are functioning properly in accordance with specifications from manufacturer.
    G12618569Courtesy of MERCEDES-BENZ USA
  2. Check protective earth conductor line (3) at attachment point of high-voltage battery charger (1) for tight seating TORQUE SPECIFICATION .
  3. Check potential equalization line (4) of high-voltage battery charger at body ground point and attachment point on high-voltage battery charger (1) for tight seating TORQUE SPECIFICATIONTORQUE SPECIFICATION .
  4. Check potential equalization line (5) of high-voltage battery at body ground point and high-voltage battery (2) attachment point for tight seating TORQUE SPECIFICATIONTORQUE SPECIFICATION .

    Conduct resistance/insulation resistance measurement of HV-AC circuit-1-phase (vehicle socket as measuring point) charger feed-in socket (X58/23) 

    5-pin charger feed-in socket (X58/23) 

    G12938269Courtesy of MERCEDES-BENZ USA

    7-pin charger feed socket (X58/23) 

    G12938270Courtesy of MERCEDES-BENZ USA
  5. Calibrate resistance/insulation resistance tester.
  6. Open socket flap in bumper with the diagnostic system.

    IMPORTANT When the vehicle has been de-energized, the socket flap can only be opened using the diagnostic system.

  7. Set resistance/insulation resistance tester to resistance testing mode.
  8. Perform resistance test using resistance/insulation resistance tester between protective earth conductor (PE) and ground point in luggage compartment.

    If the ground fault circuit interrupter integrated in the charging cable or the ground fault circuit interrupter of the external power supply has been triggered.

    IMPORTANT Specified value < 1 Ω.

  9. Perform insulation resistance test using resistance/insulation resistance tester between phase L1 (L1) and protective earth conductor (PE).

    If the ground fault circuit interrupter integrated in the charging cable or the ground fault circuit interrupter of the external power supply has been triggered.

    IMPORTANT The resistance/insulation resistance tester must be set to 500 V during measurement.

    IMPORTANT Specified value > 1 MΩ.

  10. Perform insulation resistance test using resistance/insulation resistance tester between neutral conductor (N) and protective earth conductor (PE).

    If the ground fault circuit interrupter integrated in the charging cable or the ground fault circuit interrupter of the external power supply has been triggered.

    IMPORTANT Specified value > 1 MΩ.