LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2019 >> C300 4Matic, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 351 (Collision - Substructure) >> Substructure Testing & Repair >> Remove/Install Underbody Paneling - Ar61.30-P-1001LW

Remove/Install Underbody Paneling - Ar61.30-P-1001LW

WARNING: This page is about a different car, the 2023 Mercedes-Benz GLC300, 2022 Mercedes-Benz GLC300, 2021 Mercedes-Benz GLC300, 2020 Mercedes-Benz GLC350e, and 2020 Mercedes-Benz GLC300. However, it is still accessible from the selected car via links, so may be relevant.

Model 205 

Model 253 With Engine 177, 264, 274, 276, 642, 651, 654, 656 

Fig 1: Underbody Paneling Component Locations (Model 253 With Engine 177, 264, 274, 276, 642, 651, 654, 656) (1 Of 2)
G14172813Courtesy of MERCEDES-BENZ USA

Shown on model 253 on left side of vehicle 

Shown on model 205.4 with engine 274.9 

Fig 2: Underbody Paneling Component Locations (Model 253 With Engine 177, 264, 274, 276, 642, 651, 654, 656) (2 Of 2)
G14172814Courtesy of MERCEDES-BENZ USA
       
  Notes on safety-relevant components   AH00.00-Z-0019-01A .
REMOVINGINSTALLING Remove/install     
1 Raise vehicle.   AR00.60-P-1002LWG .
2 Remove screws (9) and remove trim (10). Model 253 with engine 177, 264, 274, 276, 642, 651, 654, 656  
3 Remove screw/bolts (2).    
4 Remove expansion rivet (5). Model 205  
5 Remove expansion rivets (3) and press front fender liner (4) to the side until the nut (6) underneath is accessible. IMPORTANT Model 205
A quick-release coupling is installed instead of the nut (6).
 
6 Remove nuts (6) and remove underfloor paneling (1). IMPORTANT Model 205
Partially quick-release couplings are installed instead of nuts (6).
IMPORTANT Model 205
INSTALLATION IMPORTANT Press on quick-release couplings to stop.
INSTALLATION IMPORTANT Push underfloor paneling (1) below engine compartment paneling.
 
7 Remove nuts (7) and remove underfloor paneling (8). IMPORTANT The underfloor paneling (8) can deviate in position and mount depending on equipment installed.  
8 Install in the reverse order.