Wiring Diagram For Front Signal Acquisition And Actuation Module (SAM) Control Unit - PE54.21-P-2114FCA
WARNING: This page is about a different car, the 2023 Mercedes-Benz GLC300, 2022 Mercedes-Benz GLC300, 2021 Mercedes-Benz GLC300, 2020 Mercedes-Benz GLC350e, and 2020 Mercedes-Benz GLC300. However, it is still accessible from the selected car via links, so may be relevant.
Model 253 (except 253.99)
as of model year 2020
Control unit N10/6
Model 253.99
as of model year 2019
with code 9O1 (Fuel cell pre-installation)
Control unit N10/6
| Wiring diagram for front signal acquisition and actuation module (SAM) control unit | PE54.21-P-2114-97FCA | ||
| Arrangement of electrical connectors | GF00.19-P-1005FCA | ||
| Location of ground points | GF00.19-P-2002FCA | ||
| Location of end sleeves | GF00.19-P-3005FCA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28FCA | ||
| Use of wiring diagrams | OV00.01-P-1901-03FCA | ||
| Search aid for all electrical components | OV00.01-P-1909FCA |