Wiring Diagram For Battery Management Control Unit - PE54.10-P-2104NBA
MODEL 166.063 as of model year 2016
with CODE ME05 (HYBRID DRIVE 80KW VARIANT (INCLUDING PLUGIN))
Control unit N82/2, high-voltage battery module A100
| Wiring diagram for battery management control unit | PE54.10-P-2104-97NBA | ||
| Use of wiring diagrams | OV00.01-P-1901-03NAA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28NBA | ||
| Search aid for all electrical components | OV00.01-P-1909NBA | ||
| Location and assignment of line and plug connectors | GF00.19-P-1000NAA | ||
| Location and assignment of ground points | GF00.19-P-2000NAA | ||
| Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness) | GF00.19-P-3000NAA |