LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2017 >> GLS63 AMG >> Repair and Diagnosis >> Engine Performance >> Tune-Up >> Mixture Formation - 166 Chassis 3 Of 5 >> Testing & Repair >> Remove/Install High-Pressure Fuel Pump - AR07.02-P-1020OGR

Remove/Install High-Pressure Fuel Pump - AR07.02-P-1020OGR

ENGINE 642 in model 166, 292 

Fig 1: High-Pressure Fuel Pump Components Location - Engine 642 In Model 166
G14133741Courtesy of MERCEDES-BENZ USA

Shown on model 166 

DANGER Risk of explosion  caused by fuel igniting, risk of poisoning caused by inhaling and swallowing fuel as well as risk of injury to eyes and skin caused by contact with fuel. No fires, sparks, open flames or smoking. Pour fuels into suitable and appropriately marked containers only.
Wear protective clothing when handling fuel.
AS47.00-Z-0001-01A
DANGER Risk of explosion  caused by fuel igniting.
Risk of injury  to skin and eyes caused by fuel spraying out at high pressure
Keep all ignition sources out of hazard area.
Do not carry out any work on system when it is pressurized.
AS07.16-Z-0001-01A
REMOVINGINSTALLING Remove/install     
1 Remove upper ENGINE cover INSTALLATION IMPORTANT : Ensure correct seating of the ENGINE cover.  
2 Unclip pipework for Active Roll Stabilization on impact plate ENGINE 642 in model 166, 292
with code 468 (ACTIVE CURVE SYSTEM)
IMPORTANT The impact plate is installed in front of the belt drive.
 
3 Remove impact plate    
4 Detach retaining clamp on high-pressure line from cylinder head cover    
5 Detach pressure line (19/2) on high-pressure fitting and close off connections IMPORTANT Counterhold threaded sleeve of pressure line (19/2) when releasing using an appropriate tool.
INSTALLATION IMPORTANT : Counterhold threaded sleeve for the pressure line (19/2) when releasing using an appropriate tool.
TORQUE SPECIFICATION Pressure line to high-pressure pump
*BA07.16-P-1025-01C 
    SPECIAL TOOL Record plug Fig 2
6 Remove fuel hoses (1, 3) on high-pressure pump (2) IMPORTANT Seal fuel hoses (1, 3) using suitable stop plugs.
INSTALLATION IMPORTANT : Check condition of hose clamps and fuel hoses (1, 3) and replace if necessary.
SPECIAL TOOL Record plug
Fig 2
7 Disconnect electrical connection at quantity control valve (Y94)    
8 Disconnect electrical connection on fuel temperature sensor (B50)    
9 Remove coolant hose from bracket    
10 Remove screw/bolts for impact plate holder and remove holder    
11 Remove screw/bolts (4) for high-pressure pump (2) INSTALLATION IMPORTANT : Replace screw/bolts (4) since these are micro-encapsulated. Clean threads.
TORQUE SPECIFICATION Bolt, high-pressure pump to cylinder head
*BA07.16-P-1021-01C 
    Cold degreasing agent/cold cleaning solvent HAKU 1025-920 *BR00.45-Z-1051-04A 
12 Detach high-pressure pump (2) from the cylinder head INSTALLATION NOTES :
When replacing the high-pressure pump (2), the ignition must be switched on for at least 15 seconds before the ENGINE is started.
The high-pressure pump (2) will be damaged otherwise.
INSTALLATION IMPORTANT : Clean sealing surfaces of high-pressure pump (2), replace the O-ring and apply ENGINE oil. The high-pressure pump (2) must not be disassembled or opened.
When replacing high-pressure pump (2):
↓
Modify gear
AR07.02-P-1021GZB 
13 Install in the reverse order    
WARNING Risk of accident  from vehicle starting off by itself when ENGINE running. Risk of injury  (bruises and burns) resulting from working on the ENGINE while it is being started or when it is running. Secure vehicle to prevent it from starting off by itself. Wear closed and snug-fitting work clothes. Do not touch hot or rotating parts. AS00.00-Z-0005-01A
14 Check fuel system for leaks with ENGINE running    
COMMON RAIL DIESEL INJECTION SYSTEM (CDI)

Number Designation ENGINE 642
BA07.16-P-1021-01C Bolt, high-pressure pump to cylinder head Nm 15
COMMON RAIL DIESEL INJECTION SYSTEM (CDI)

Number Designation ENGINE 642
BA07.16-P-1025-01C Pressure line to high-pressure pump M14 Nm 33
Fig 2: Identifying Record Plug (129 589 00 91 00)
G07473018Courtesy of MERCEDES-BENZ USA
REPAIR MATERIALS

Number Designation Order number
BR00.45-Z-1051-04A Cold degreasing agent/cold cleaning solvent HAKU 1025-920 Chemische Werke Kluthe GmbH
Gottlieb-Daimler-Str. 12
69115 Heidelberg
Germany
Tel. +49 6221 5301-0
Fax +49 6221 5301-176
http: //kluthe.com