LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2017 >> E43 AMG >> Repair and Diagnosis >> Body & Frame >> Exterior Body Panels >> Collision - Roof (213 Chassis) >> General Information >> Notes On Handling Adhesive Material For Installation Of Roof Paneling - Ah65.10-P-1000-02A

Notes On Handling Adhesive Material For Installation Of Roof Paneling - Ah65.10-P-1000-02A

Model all (smart) 

NOTES The bonding surfaces should be free of dust, oil, grease, wax, dirt and other adhesive components or dirt residues. Wear cotton gloves Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES Allow primer to flash off for at least 10 min.

Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES Position the roof paneling onto the body flange within a period of 10 minutes.

Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES If new parts were installed during a body repair, mask off bonding surfaces before painting.

Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES Adhesive material may only be applied only to existing beads of glue that have been cut down, or to the original factory primer or repair primer approved by Daimler.

Use only primer filler approved by Daimler AG:

Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES The object and room temperature should be min. 15°C and should not exceed 35°C.

NOTES Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES Before starting work, all components, materials and tools must be prepared for installation.

Otherwise the adhesive force of the adhesive material starts to decrease.

NOTES Observe following information at all times.

Otherwise, reliable and correct bonding cannot be assured because it is not possible.